2020
DOI: 10.1109/tpwrd.2019.2916034
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive Coordination for Power and SoC Limiting Control of Energy Storage in an Islanded AC Microgrid With Impact Load

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
16
0

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
2
2
1

Relationship

1
9

Authors

Journals

citations
Cited by 40 publications
(16 citation statements)
references
References 34 publications
0
16
0
Order By: Relevance
“…This, also, imposes degradation costs which affect its optimal operation. Additionally, providing the frequency support may cause the SoC of BESS to not follow the optimal schedule given by steady-state programs, like economic dispatch, or even may make the BESS goes beyond its SoC limits [11]. This issue is more vital in the low-voltage MGs where the loads change randomly and frequently.…”
Section: Research Gapsmentioning
confidence: 99%
“…This, also, imposes degradation costs which affect its optimal operation. Additionally, providing the frequency support may cause the SoC of BESS to not follow the optimal schedule given by steady-state programs, like economic dispatch, or even may make the BESS goes beyond its SoC limits [11]. This issue is more vital in the low-voltage MGs where the loads change randomly and frequently.…”
Section: Research Gapsmentioning
confidence: 99%
“…3. Since the voltage reference of the battery does not change and set to v dc,ref as well, the battery is also operated in the isochronous mode which only compensates the transient loads as a swing machine [19], [20]. To assign fast load compensation to the battery and slow transient to the DGs, low-pass filters are used in the DC voltage measurement as seen in Fig.…”
Section: B Load Sharing Between the Energy Sourcesmentioning
confidence: 99%
“…This, also, imposes degradation costs which affect its optimal operation. Additionally, providing the frequency support may cause the SoC of BESS to not follow the optimal schedule given by economic dispatch or even may make the BESS goes beyond its SoC limits [10]. This issue is more vital in the low-voltage MGs where the loads change randomly and frequently.…”
Section: Covering Intermittent Renewables (1~15 𝑚𝑖𝑛𝑠)mentioning
confidence: 99%