2015
DOI: 10.14257/ijca.2015.8.1.21
|View full text |Cite
|
Sign up to set email alerts
|

Adaptive Scheduling Model in Hybrid Flowshop Production Control using Petri Net

Abstract: Abstract

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2017
2017
2021
2021

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 10 publications
0
1
0
Order By: Relevance
“…For the above reasons, recently, scheduling and the more general topic of scheduling under uncertainty have attracted the interest of many researchers (Guo 2006) an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machines, such that the maximal completion time (makespan) of all operations is minimized (Kacem et al 2002;Hu 2015).…”
Section: Literature Reviewmentioning
confidence: 99%
“…For the above reasons, recently, scheduling and the more general topic of scheduling under uncertainty have attracted the interest of many researchers (Guo 2006) an operation to be processed by any machine from a given set. The problem is to assign each operation to a machine and to order the operations on the machines, such that the maximal completion time (makespan) of all operations is minimized (Kacem et al 2002;Hu 2015).…”
Section: Literature Reviewmentioning
confidence: 99%