“…The preliminary hazards report discusses hazards that posed a threat to the first barrier for the fuel salt, including (1) melting of pipe/component walls due to reactivity excursion or decay heat, (2) failure from excessive stresses such as thermal or pressure, and (3) failure due to corrosion. Some IEs that were assumed to be capable of producing these hazards and that could possibly lead to a failure of this first barrier if unmitigated include [6]:…”