2023
DOI: 10.24036/ujsds/vol1-iss1/10
|View full text |Cite
|
Sign up to set email alerts
|

Adding Exogenous Variable in Forming ARIMAX Model to Predict Export Load Goods in Tanjung Priok Port

Abstract: The main idea of world maritime has been launched by the Indonesia’s Government through the development of inter-island connectivity, namely a logistics distribution line system using cargo ships with scheduled routes. However, in terms of inter-island sea transportation connectivity using sea transportation, the number of ships used for loading and unloading activities at Tanjung Priok in 2020 reached 11,876 units, which number decreased by 12.6% compared to the previous year, this figure was not sufficient f… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
2
0

Year Published

2023
2023
2024
2024

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 1 publication
0
2
0
Order By: Relevance
“…Furthermore, using the ARIMA model that has been significant in the previous stage, a parameter significance test is carried out for the ARIMAX model with the addition of exogenous variables (Elvina et al, 2023). Models with all significant model parameters are continued to the diagnostic test stage of the ARIMAX model (Ahmar et al, 2022).…”
Section: Thismentioning
confidence: 99%
“…Furthermore, using the ARIMA model that has been significant in the previous stage, a parameter significance test is carried out for the ARIMAX model with the addition of exogenous variables (Elvina et al, 2023). Models with all significant model parameters are continued to the diagnostic test stage of the ARIMAX model (Ahmar et al, 2022).…”
Section: Thismentioning
confidence: 99%
“…Several researchers who have forecasted using the ARMAX model include (Pradana et al, 2022), (Riestiansyah et al, 2022) and (Elvina et al, 2023). The results of their research show that the ARMAX model is more accurate in forecasting than the ARMA model.…”
mentioning
confidence: 99%