2005
DOI: 10.1021/ie049732g
|View full text |Cite
|
Sign up to set email alerts
|

Addressing Robustness in Scheduling Batch Processes with Uncertain Operation Times

Abstract: The uncertainty present in any process environment and related not only to variable market demand but also to operational disturbances is usually unavoidable, and therefore, poor performance may be attained with the execution of deterministic optimal schedules. In this work, the short-term scheduling problem in chemical batch processes with variable processing times is addressed with the aim to identify robust schedules able to face the major effects driving the operation of batch processes with uncertain time… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
28
0
1

Year Published

2006
2006
2017
2017

Publication Types

Select...
5
4
1

Relationship

2
8

Authors

Journals

citations
Cited by 55 publications
(29 citation statements)
references
References 21 publications
0
28
0
1
Order By: Relevance
“…Otherwise, another well-known approach that is presented as a robust manner of making decisions under uncertainty is to solve the planning problem using stochastic programming Tsiakis et al 2001;Ierapetritou and Pistikopoulos 1996;Bonfill et al 2005). A solution with the optimal expected performance is obtained by including estimated scenarios in the formulation; these estimated scenarios are generated by representing uncertain parameters as random variables (see Appendix A.6).…”
Section: Managing Dynamics In the Integrated Planning Of The Scmentioning
confidence: 99%
“…Otherwise, another well-known approach that is presented as a robust manner of making decisions under uncertainty is to solve the planning problem using stochastic programming Tsiakis et al 2001;Ierapetritou and Pistikopoulos 1996;Bonfill et al 2005). A solution with the optimal expected performance is obtained by including estimated scenarios in the formulation; these estimated scenarios are generated by representing uncertain parameters as random variables (see Appendix A.6).…”
Section: Managing Dynamics In the Integrated Planning Of The Scmentioning
confidence: 99%
“…La gestión del riesgo se aborda mediante la adición de una medida de control como un nuevo objetivo a tener en cuenta, lo que conduce a formulaciones de optimización multi-objetivo. En [6], los autores abordaron el problema de programación a corto plazo en procesos por lotes químicos junto con tiempos de procesamiento de variables, para identificar los horarios robustos capaces de enfrentar los principales efectos de conducir la operación de estos procesos con tiempos inciertos, es decir, inactivo, así como los tiempos de espera. El enfoque sobre restricciones de oportunidad, se concentra en la fiabilidad del sistema, es decir, en la capacidad del sistema para satisfacer la viabilidad en un entorno incierto.…”
Section: Métodos Para Tratar La Incertidumbreunclassified
“…The plants of the network are assumed to be multipurpose batch-chemical plants, with a structure adapted from the case study proposed by Kondili et al 35 There is unlimited storage for all the states. The initial inventories are (13,18,13,16,12,17,12,15) supposed to be equal to zero for all the states. Two different types of utilities are considered, the first one, which is associated with the labor tasks, has a cost of 0.25 m.u.…”
Section: Examplementioning
confidence: 99%