2010
DOI: 10.5028/jatm.2010.02026610
|View full text |Cite
|
Sign up to set email alerts
|

Advances of orbital gas tungsten arc welding for Brazilian space applications - experimental setup

Abstract: The present work describes details of the several steps of the technology involved for the orbital Gas Tungsten Arc Welding (GTAW) process of pure commercially titanium tubes. These pieces will be used to connect the several components of the propulsion system of the China-Brazilian Satellite CBERS, and is part of the Brazilian aerospace industry development. The implantation involved the steps of environment control; cut and facing of the base metal; cleaning procedures; piece alignment; choice of the type, g… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
5
0
1

Year Published

2015
2015
2023
2023

Publication Types

Select...
7
1

Relationship

0
8

Authors

Journals

citations
Cited by 8 publications
(6 citation statements)
references
References 4 publications
0
5
0
1
Order By: Relevance
“…The principle advantage of the sleeve fitting is the added reliability; thin-walled tubes are particularly challenging to join and whilst tube-to-tube butt joinery is feasible to perform in a lab environment, the transfer into industrial production greatly benefits from the inclusion of the sleeve. This sleeve thus serves as an improvement compared to butt joints of thin-walled tubes and is successfully demonstrated on thinner-walled tubing than reported previously [8]. Reliability is the main challenge when welding thin-walled tubing; many welding machines are not optimized for the required low amperages of thin-walled tube welding so welding procedures are awkward to translate between different machines.…”
Section: Discussionmentioning
confidence: 90%
See 1 more Smart Citation
“…The principle advantage of the sleeve fitting is the added reliability; thin-walled tubes are particularly challenging to join and whilst tube-to-tube butt joinery is feasible to perform in a lab environment, the transfer into industrial production greatly benefits from the inclusion of the sleeve. This sleeve thus serves as an improvement compared to butt joints of thin-walled tubes and is successfully demonstrated on thinner-walled tubing than reported previously [8]. Reliability is the main challenge when welding thin-walled tubing; many welding machines are not optimized for the required low amperages of thin-walled tube welding so welding procedures are awkward to translate between different machines.…”
Section: Discussionmentioning
confidence: 90%
“…Reports on thin-walled tube CP-2 joinery are very limited and, to the author's knowledge, only address wall thicknesses above 500 µm. de Garcia et al [8] joined 6 mm OD, 1 mm wall thickness, CP-2 Ti tubing for a satellite propulsion system using orbital GTAW welding with internal pressurization to join the tubing. However, for alignment, they manually tacked the tubes together.…”
Section: Jinst 15 P06022mentioning
confidence: 99%
“…The work of de Garcia et al [17] involved welding 1 mm wall thickness, 6 mm OD, titanium tubing for a satellite propulsion system using orbital GTAW with internal pressurization. Whilst this work does demonstrate the need for internal pressurization, a manual tacking process was used for tube alignment.…”
Section: Thin Tubementioning
confidence: 99%
“…Além do setor de óleo e gás, esse processo encontra aplicabilidade no setor aeroespacial devido à grande responsabilidade relacionada às soldas submetidas às altas pressões, fazendo-se necessário alto nível de qualidade e reprodutibilidade, difíceis de serem alcançados por processos de soldagem manuais [9][10][11][12].…”
Section: Influência Da Posição E Dos Parâmetros De Soldagem Na Soldagunclassified