2007
DOI: 10.2514/1.20264
|View full text |Cite
|
Sign up to set email alerts
|

Aircraft Landing Scheduling Optimization for Single Runway Noncontrolled Airports: Static Case

Abstract: Engineering Notes ENGINEERING NOTES are short manuscripts describing new developments or important results of a preliminary nature. These Notes should not exceed 2500 words (where a figure or table counts as 200 words). Following informal review by the Editors, they may be published within a few months of the date of receipt. Style requirements are the same as for regular contributions (see inside back cover).

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
3
3

Relationship

0
6

Authors

Journals

citations
Cited by 10 publications
(4 citation statements)
references
References 8 publications
0
4
0
Order By: Relevance
“…In the existing literature, the flight scheduling problem is usually regarded as a single-queue optimization problem, from which the aircraft can be pulled out and "paused" [ 11 , 12 ]. In this context, an optimized scheduling model is designed for uncontrolled airports, and then an optimized scheduling algorithm is tailored for this model [ 13 ].…”
Section: Literature Reviewmentioning
confidence: 99%
“…In the existing literature, the flight scheduling problem is usually regarded as a single-queue optimization problem, from which the aircraft can be pulled out and "paused" [ 11 , 12 ]. In this context, an optimized scheduling model is designed for uncontrolled airports, and then an optimized scheduling algorithm is tailored for this model [ 13 ].…”
Section: Literature Reviewmentioning
confidence: 99%
“…An alternative is to modify the algorithms and interfaces so that they work in a distributed architecture with each pilot negotiating and managing conflicts and queue placement, modifications that have been demonstrated to be feasible, efficient, and safe. 49,50…”
Section: Sequencing Scheduling and Spacingmentioning
confidence: 99%
“…Xue and Zelinski formulated ALP as multiple objectives: minimizing expectation values of total delays and controller interventions, respectively [2] . A dynamic multi-objectives scheduling of aircraft landings on a single runway was studied by Ding, etc., in which runway throughput, earliness and lateness, the cost of fuel arising from aircraft maneuvers are considered, but additional flight time incurred to achieve the landing schedule [3] . These schemes utilized only a set of weights and just less than 3 objectives, different stakeholders may need different weights and consider more objectives in practice.…”
Section: Introductionmentioning
confidence: 99%