2009
DOI: 10.1016/j.eswa.2009.02.008
|View full text |Cite
|
Sign up to set email alerts
|

An efficient approach to cross-fab route planning for wafer manufacturing

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2012
2012
2024
2024

Publication Types

Select...
2
2

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(2 citation statements)
references
References 15 publications
0
2
0
Order By: Relevance
“…The other track focused on the capacity-trading decisions between the two plants. Example studies on the route assignment decisions include Toba et al (2005) and Wu et al (2009aWu et al ( , 2009b. Example studies on the capacity-trading decisions include Wu and Chang (2007), Chen et al (2008), Chiang et al (2010) and Renna and Argoneto (2011).…”
Section: Relevant Literaturementioning
confidence: 99%
See 1 more Smart Citation
“…The other track focused on the capacity-trading decisions between the two plants. Example studies on the route assignment decisions include Toba et al (2005) and Wu et al (2009aWu et al ( , 2009b. Example studies on the capacity-trading decisions include Wu and Chang (2007), Chen et al (2008), Chiang et al (2010) and Renna and Argoneto (2011).…”
Section: Relevant Literaturementioning
confidence: 99%
“…In the route assignment studies, Wu et al (2009aWu et al ( , 2009b focused on how to plan the production routes of jobs in advance to optimise capacity utilisation. In contrast, Toba et al (2005) addressed the route assignment problem in shop floor control context; that is, how to determine the production route of a job in a real time manner by dynamically considering machine breakdown status.…”
Section: Relevant Literaturementioning
confidence: 99%