2005
DOI: 10.1093/ietfec/e88-a.12.3351
|View full text |Cite
|
Sign up to set email alerts
|

An Engineering Change Orders Design Method Based on Patchwork-Like Partitioning for High Performance LSIs

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2

Citation Types

0
2
0

Year Published

2012
2012
2013
2013

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…In the literature, ECs are also used to term changes in the context of construction [e.g., Thomas and Napolitan, 1995; Mokhtar et al, 1998; Hanna et al, 1999a, 1999b; G. Lee et al, 2003; Hanna and Swanson, 2007; Zhao et al, 2008; Yilin and Xie, 2010], software engineering [e.g., Lindvall and Sandahl, 1998; Rajlich, 2000; Schach and Tomer, 2000; Ibrahim et al, 2005; Hassan et al, 2010; W.‐T. Lee et al, 2010], and Integrated Circuits and Systems [e.g., Khatri et al, 1996; Kirovski and Potkonjak, 1999; Perfecto et al, 1999; Drinić and Kirovski, 2002; Kirovski et al, 2005; Nakamura et al, 2005; Kuo et al, 2009]. Publications from those areas are included if they contribute to ECM in a mechanical design context.…”
Section: Literature Survey and Categorizationmentioning
confidence: 99%
“…In the literature, ECs are also used to term changes in the context of construction [e.g., Thomas and Napolitan, 1995; Mokhtar et al, 1998; Hanna et al, 1999a, 1999b; G. Lee et al, 2003; Hanna and Swanson, 2007; Zhao et al, 2008; Yilin and Xie, 2010], software engineering [e.g., Lindvall and Sandahl, 1998; Rajlich, 2000; Schach and Tomer, 2000; Ibrahim et al, 2005; Hassan et al, 2010; W.‐T. Lee et al, 2010], and Integrated Circuits and Systems [e.g., Khatri et al, 1996; Kirovski and Potkonjak, 1999; Perfecto et al, 1999; Drinić and Kirovski, 2002; Kirovski et al, 2005; Nakamura et al, 2005; Kuo et al, 2009]. Publications from those areas are included if they contribute to ECM in a mechanical design context.…”
Section: Literature Survey and Categorizationmentioning
confidence: 99%
“…In the literature, ECs are also used to term changes in the context of construction [e.g., Thomas and Napolitan, 1995; Mokhtar et al, 1998; Hanna et al, 1999a, 1999b; G. Lee et al, 2003; Hanna and Swanson, 2007; Zhao et al, 2008; Yilin and Xie, 2010], software engineering [e.g., Lindvall and Sandahl, 1998; Rajlich, 2000; Schach and Tomer, 2000; Ibrahim et al, 2005; Hassan et al, 2010; W.‐T. Lee et al, 2010], and Integrated Circuits and Systems [e.g., Khatri et al, 1996; Kirovski and Potkonjak, 1999; Perfecto et al, 1999; Drinić and Kirovski, 2002; Kirovski et al, 2005; Nakamura et al, 2005; Kuo et al, 2009]. Publications from those areas are included if they contribute to ECM in a mechanical design context.…”
Section: Literature Survey and Categorizationmentioning
confidence: 99%