2012
DOI: 10.1016/j.ijepes.2012.05.013
|View full text |Cite
|
Sign up to set email alerts
|

An enhanced method for contribution assessment of utility and customer harmonic distortions in radial and weakly meshed distribution systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1

Citation Types

0
21
0

Year Published

2012
2012
2019
2019

Publication Types

Select...
8
1

Relationship

1
8

Authors

Journals

citations
Cited by 33 publications
(21 citation statements)
references
References 20 publications
0
21
0
Order By: Relevance
“…This is much more relevant in rural facilities with radial distribution systems and with automatic disconnection of the inverter from the grid due to overvoltage beyond the technical established limit (253 V). The latter is considered to be a serious PQ problem in PV systems, which may occur due to the use of power inverters, and causes decreases in the reliability of power systems [39].…”
Section: Procedures Analysis and Methodologiesmentioning
confidence: 99%
“…This is much more relevant in rural facilities with radial distribution systems and with automatic disconnection of the inverter from the grid due to overvoltage beyond the technical established limit (253 V). The latter is considered to be a serious PQ problem in PV systems, which may occur due to the use of power inverters, and causes decreases in the reliability of power systems [39].…”
Section: Procedures Analysis and Methodologiesmentioning
confidence: 99%
“…The earliest technique to localize the harmonic sources is utilizing power direction technique, however, this method cannot give accurate results when some harmonics and phase angle beyond 90° [9], [10]. Moreover, a state estimation method is introduced with the implementation of least square and Kirchhoff current law [11].…”
Section: Introductionmentioning
confidence: 99%
“…Electric power systems that are growing in size and complexities are always exposed to the various types of component failures [1]. To decrease the failure time and minimize the damages, the faulty element or possibly faulty region should be detected and disconnected from the rest of the system as fast and accurate as possible [2].…”
Section: Introductionmentioning
confidence: 99%