2015
DOI: 10.1007/s40815-015-0118-0
|View full text |Cite
|
Sign up to set email alerts
|

An Exact Expected Value-Based Method to Prioritize Engineering Characteristics in Fuzzy Quality Function Deployment

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2017
2017
2022
2022

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 16 publications
(6 citation statements)
references
References 38 publications
0
6
0
Order By: Relevance
“…From existing research, ECs usually refer to the key performances, dimensions, materials or other properties of a product [21][22][23]. For PSS, ECs also include service characteristics, such as service response time, technical support level, etc.…”
Section: Engineering Characteristics Designmentioning
confidence: 99%
See 1 more Smart Citation
“…From existing research, ECs usually refer to the key performances, dimensions, materials or other properties of a product [21][22][23]. For PSS, ECs also include service characteristics, such as service response time, technical support level, etc.…”
Section: Engineering Characteristics Designmentioning
confidence: 99%
“…Assembly cost (18,20), (20,22), (22,24) Fault detection cost (432, 480), (480, 528), (528, 576) It can be seen from Fig. 9 that after decomposing the manufacturing cost and maintenance cost, the urchased parts cost node has the largest number of parent nodes in BN, which has 8 parent nodes, and there are 384 parent node status combinations.…”
Section: Cost Itemsmentioning
confidence: 99%
“…Wong et al suggested a fuzzy approach to determine the aggregated importance weights of ECs through fuzzy expert systems in QFD [29]. Liu et al put forward an approach to get the exact expected values and rank the importance of ECs in fuzzy QFD environments [30]. In order to overcome the subjectivity of fuzzy membership function selection, some proposed a fuzzy axiomatic design method based on rough set to guide the design decision-making process with inaccurate information [31].…”
Section: Fuzzy Sets Eory and Rough Set Eorymentioning
confidence: 99%
“…Fuzzy set theory was widely employed to calculate the rankings of ECs under the circumstance of vagueness and impreciseness. Fuzzy multiple objective programming [7], fuzzy goal programming [8], fuzzy relationship and correlations [9], and expected value-based method [10] are proposed to prioritize ECs. In addition, Geng et al [11] integrated the analytic network process to QFD to reflect the initial importance weights of ECs.…”
Section: Introductionmentioning
confidence: 99%
“…All the evaluation matrices uniformed are aggregated with 2TLWGBM operator in virtue of Equation(10) intoR ij (i = 1, 2, • • • , n ; j = 1, 2, • • • , s).Furthermore, the new matrix represents ultimate relationship matrix between CRs and ECs in essence.…”
mentioning
confidence: 99%