An Indicator System for Evaluating Operation and Maintenance Management of Mega Infrastructure Projects in China

Abstract: Mega infrastructure projects provide a basic guarantee for social development, economic construction, and livelihood improvement. Their operation and maintenance (O&M) management are of great significance for the smooth operation and the realization of the value created by the projects. In order to provide an approach for effectively evaluating O&M management, this study develops a holistic indicator system using a mixed-review method from the national macro perspective in China. In this study, literat… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
8
0

Year Published

2021
2021
2023
2023

Publication Types

Select...
7

Relationship

0
7

Authors

Journals

citations
Cited by 8 publications
(8 citation statements)
references
References 71 publications
0
8
0
Order By: Relevance
“…As technology has advanced in recent years, the use of BIM has proven to be an innovative, useful, and effective factor in the development of sustainable projects [19][20][21]. The benefits of BIM have been recognised, particularly in the processes of design, performance assessment, visualisation, management, and, more recently, the operations and maintenance of the project [22][23][24]. However, despite the continuous increase in the use of BIM, the anticipated gain from the investment has not yet been perceived [25,26].…”
Section: Literature Reviewmentioning
confidence: 99%
See 1 more Smart Citation
“…As technology has advanced in recent years, the use of BIM has proven to be an innovative, useful, and effective factor in the development of sustainable projects [19][20][21]. The benefits of BIM have been recognised, particularly in the processes of design, performance assessment, visualisation, management, and, more recently, the operations and maintenance of the project [22][23][24]. However, despite the continuous increase in the use of BIM, the anticipated gain from the investment has not yet been perceived [25,26].…”
Section: Literature Reviewmentioning
confidence: 99%
“…Previous literature has revealed that BIM is not fully utilised and adopted in the industry, despite the realisation of the potential and opportunities that BIM offers for construction projects [17,23,29,51]. The existing literature also revealed an obvious lack of studies focusing on identifying the level of BIM implementation in the wood construction industry in general and in Sweden in particular.…”
Section: Research Gaps and Limitationsmentioning
confidence: 99%
“…We obtained a standardized reliability coefficient value of 0.958, which was more than 0.9, and the KMO (Kaiser–Meyer–Olkin) value was 0.953, which was more than 0.8 [ 22 ]. Bartlett’s sphericity test reached a significance level ( p < 0.0001) [ 23 ], indicating that the sample size was adequate. Next, we tested the reliability and validity using the AMOS 22.0 software to conduct structural equation modeling and hypothesis testing.…”
Section: Quantitative Research Design and Data Analysismentioning
confidence: 99%
“…The operation and maintenance (O&M) phase is considered an important part of a project's whole lifecycle, which provides effective operational assurance for megaprojects [47]. Although the dramatic increase in the number of megaprojects has yielded considerable socioeconomic benefits, the long-term impacts of O&M management [55,73], such as high energy consumption, high pollutant emissions, and personal hazards, on environmental, economic, and societal problems cannot be ignored during the O&M phase [74,75]. Therefore, researchers have adopted different perspectives to explore and resolve problems during O&M management, including environmental performance [76], social responsibility [63], the evaluation of O&M management [75], and sustainability megaprojects [77].…”
Section: Overview Of Megaproject Management Researchmentioning
confidence: 99%
“…Although the dramatic increase in the number of megaprojects has yielded considerable socioeconomic benefits, the long-term impacts of O&M management [55,73], such as high energy consumption, high pollutant emissions, and personal hazards, on environmental, economic, and societal problems cannot be ignored during the O&M phase [74,75]. Therefore, researchers have adopted different perspectives to explore and resolve problems during O&M management, including environmental performance [76], social responsibility [63], the evaluation of O&M management [75], and sustainability megaprojects [77]. Specifically, O&M management also faces the constraint of cost, capacity, and quality [78], and such problems should be solved in four aspects in the early phases of planning, design, and development: financial, structural, managerial, and training aspects.…”
Section: Overview Of Megaproject Management Researchmentioning
confidence: 99%