“…Lan, Yu, Lin, Tung, Yen and Deng [4] had presented a note on the improved algebric method for the EPQ model with stochastic lead time. Shamsi, Haji, Shadrokh and Nourbakhsh [13] published their work on economic production quantity in reworkable production systems with inspection errors, scraps and backlogging. Wee, Wang and Yang [5] had formulated a production quantity model for imperfect quality items with shortage and screening constraint.…”