1994
DOI: 10.1109/59.331422
|View full text |Cite
|
Sign up to set email alerts
|

An on-line dynamic security analysis system implementation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
5
0

Year Published

1998
1998
2003
2003

Publication Types

Select...
5
3

Relationship

0
8

Authors

Journals

citations
Cited by 35 publications
(5 citation statements)
references
References 10 publications
0
5
0
Order By: Relevance
“…Thus for this stability-constrained OPF, roughly 220 constraints need to be appended to standard OPF (l) to (7). For steady-state security constrained OPF, 10 constraints would need to be appended to standard OPF (l) to (7). This analysis is however overly simplistic because of the following reasons.…”
Section: B Computational Complexitymentioning
confidence: 99%
See 1 more Smart Citation
“…Thus for this stability-constrained OPF, roughly 220 constraints need to be appended to standard OPF (l) to (7). For steady-state security constrained OPF, 10 constraints would need to be appended to standard OPF (l) to (7). This analysis is however overly simplistic because of the following reasons.…”
Section: B Computational Complexitymentioning
confidence: 99%
“…As an example assume: -There are 10 contingency constraints -The integration step size is 0.1 second -The integration period is 2 seconds -There are 2 network switches (the point in time where the fault is applied and cleared) Note that each integration step imposes one set of constraints, those are, equations (12)- (16), so each contingency imposes a set of 22 constraints (2/0.1 2 constraints). Thus for this stability-constrained OPF, roughly 220 constraints need to be appended to standard OPF (l) to (7). For steady-state security constrained OPF, 10 constraints would need to be appended to standard OPF (l) to (7).…”
Section: B Computational Complexitymentioning
confidence: 99%
“…Systems of this type that have already been implemented include the TSC of Chubu Electric Power [1] and the DSA of BC-Hydro [2]. The behavior of generators in CEPC is affected by the swings of generators in the neighboring utilities.…”
Section: Introductionmentioning
confidence: 99%
“…The second experimental site, located at the Greek TSO (HTSO), is addressed in another paper [3]. [2], [4], [5] to use them in the Real-time mode and to include them into realistic Training mode. TS and MS are very much related to existing power system simulator and to specific market.…”
Section: Introductionmentioning
confidence: 99%