1995
DOI: 10.1016/0925-5273(95)00024-i
|View full text |Cite
|
Sign up to set email alerts
|

An options view of investments in expansion-flexible manufacturing systems

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
11
0

Year Published

2005
2005
2018
2018

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 20 publications
(11 citation statements)
references
References 20 publications
0
11
0
Order By: Relevance
“…Additional setup cost to switch between workstations, jobs, or products. Galvin (1987), Gascon and Leachman (1988), Sethi and Sethi (1990), Yan and Zhang (1997), Wolsey (1997), Van Oyen (1998), Inman (1999), Tsubone and Horikawa (1999), Robinson and Sahin (2001), Lahmar et al (2003), Han et al (2003), Hur et al (2003), de Matta and Miller (2004), Hajji et al (2004), Wu et al (2004), Brahimi et al (2006) Switching the production rate Hall (1988), Kim and Han (2001), Kamrad and Ernst (2001), Larsen (2005) Machine start-up/shutdown Pattloch and Schmidt (1996), Liaee and Emmons (1997), Kim and Han (2001), Khouja (2005), Sim et al (2006) Machine cleaning Kumar (1995), Wolsey (1997), Olson and Schniederjans (2000), Robinson andSahin (2001), de Matta andMiller (2004), Brahimi et al (2006) Production loss Watkins (1957), Paul et al (1980), Weber (2006 Tooling Kumar (1995), Sim et al (2006), Brahimi et al (2006) Deterioration in quality Paul et al (1980), Khouja (2005) Machine adjustment Koulamas (1993), …”
Section: Accounting For Switching (Changeover) Costsmentioning
confidence: 98%
“…Additional setup cost to switch between workstations, jobs, or products. Galvin (1987), Gascon and Leachman (1988), Sethi and Sethi (1990), Yan and Zhang (1997), Wolsey (1997), Van Oyen (1998), Inman (1999), Tsubone and Horikawa (1999), Robinson and Sahin (2001), Lahmar et al (2003), Han et al (2003), Hur et al (2003), de Matta and Miller (2004), Hajji et al (2004), Wu et al (2004), Brahimi et al (2006) Switching the production rate Hall (1988), Kim and Han (2001), Kamrad and Ernst (2001), Larsen (2005) Machine start-up/shutdown Pattloch and Schmidt (1996), Liaee and Emmons (1997), Kim and Han (2001), Khouja (2005), Sim et al (2006) Machine cleaning Kumar (1995), Wolsey (1997), Olson and Schniederjans (2000), Robinson andSahin (2001), de Matta andMiller (2004), Brahimi et al (2006) Production loss Watkins (1957), Paul et al (1980), Weber (2006 Tooling Kumar (1995), Sim et al (2006), Brahimi et al (2006) Deterioration in quality Paul et al (1980), Khouja (2005) Machine adjustment Koulamas (1993), …”
Section: Accounting For Switching (Changeover) Costsmentioning
confidence: 98%
“…[3,[22][23][24][25][26]). The bases of the developments are the decisions whether to buy flexible or non-flexible equipment and how much capacity should be acquired, with regard to the fact that investment is irreversible.…”
Section: Literature Reviewmentioning
confidence: 99%
“…For example, Kumar [29] considers investment decisions related to expansion-flexible manufacturing systems and evaluates its value using a valuation model for option proposed by Margrabe [30]. And Bengtsson [31] investigates manufacturing flexibility in terms of real options.…”
Section: Uncertainty Inherent In the Ams Investment Projectmentioning
confidence: 99%