2023
DOI: 10.33795/elposys.v9i2.618
|View full text |Cite
|
Sign up to set email alerts
|

Analisis Aliran Daya Reconductoring Saluran Transmisi Paiton Kraksaan-Probolinggo 150 kV Terhadap Saluran Yang Terimbas

Abstract: Provision of quality and sufficient electrical energy is something that must be done by PT. PLN (Persero). Based on data from PT. PLN (Persero), carried out work on replacing conductors on the Paiton – Kraksaan – Probolinggo transmission line from the TACSR 330 mm2 conductor with KHA 1190 A to 2xACCC/TW Copenhagen with KHA 2016 A. Reconductoring work is one of the efforts to uprating the transmission line by considering increasing load requirements. This reconductoring is carried out using the open circuit met… Show more