2008 IEEE Power and Energy Society General Meeting - Conversion and Delivery of Electrical Energy in the 21st Century 2008
DOI: 10.1109/pes.2008.4596130
|View full text |Cite
|
Sign up to set email alerts
|

Analysis of measured flickers contributed by a commercial wind power generation system in Taiwan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
0
0

Year Published

2013
2013
2017
2017

Publication Types

Select...
4
2

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 8 publications
0
0
0
Order By: Relevance
“…Literature [6] analyze IEC recommend methods, compared the different flickermeters, pointing out that for different frequency bands, the measurement results vary a lot. [7] [8] analyzed the flicker caused by Grid-connected PV inverters and wind farm separately.…”
Section: Introductionmentioning
confidence: 99%
“…Literature [6] analyze IEC recommend methods, compared the different flickermeters, pointing out that for different frequency bands, the measurement results vary a lot. [7] [8] analyzed the flicker caused by Grid-connected PV inverters and wind farm separately.…”
Section: Introductionmentioning
confidence: 99%