2008 IEEE/PES Transmission and Distribution Conference and Exposition 2008
DOI: 10.1109/tdc.2008.4517244
|View full text |Cite
|
Sign up to set email alerts
|

Application of inverter-based systems for peak shaving and reactive power management

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
6
0

Year Published

2012
2012
2020
2020

Publication Types

Select...
6
3

Relationship

0
9

Authors

Journals

citations
Cited by 14 publications
(6 citation statements)
references
References 0 publications
0
6
0
Order By: Relevance
“…Therefore, ESS can be useful in reducing the size and the number of generators to deal with variable loads by shaving the peaks or levelling the loads, which consequently reduces the emissions, fuel consumption, as well as wear and tear on the engines. In [107], distributed ESS contains a NaS battery that is utilized to shave the peak in order to mitigate the capacity constraints. In [108], 1 MW ESS based on Li-ion battery is installed at Nagasaki Shipyard for peak shaving operations.…”
Section: Load Leveling and Peak Shavingmentioning
confidence: 99%
“…Therefore, ESS can be useful in reducing the size and the number of generators to deal with variable loads by shaving the peaks or levelling the loads, which consequently reduces the emissions, fuel consumption, as well as wear and tear on the engines. In [107], distributed ESS contains a NaS battery that is utilized to shave the peak in order to mitigate the capacity constraints. In [108], 1 MW ESS based on Li-ion battery is installed at Nagasaki Shipyard for peak shaving operations.…”
Section: Load Leveling and Peak Shavingmentioning
confidence: 99%
“…This topology is shown in Fig. 10, where conventional dc-dc boost converters and conventional three-phase two-level dc-ac inverters are used as coupling and power conditioning system [94].…”
Section: Elements Of Ees Dynamics and Interface Convertersmentioning
confidence: 99%
“…Present there are two fundamental controls for BESS. The first operates BESS using a fixed scheduled pattern that is pre-determined from historical demand [7]- [9] and the second is a load following control with real time monitoring of power network, mitigates peak demand when the consumption exceeds a set threshold [10]- [12]. The first control has advantage of removing the need of monitoring the power network.…”
Section: A Fundamental Bess Peak Reduction Controlmentioning
confidence: 99%