2012
DOI: 10.1080/01446193.2012.700405
|View full text |Cite
|
Sign up to set email alerts
|

Applying Lean principles to a building refurbishment project: experiences of key stakeholders

Abstract: Lean construction can be conceptualized as a process-oriented approach derived from the Toyota Production System (TPS). Elements of the approach include pull-driven scheduling, minimizing stock held on site, visual management, levelling workloads and teamwork. While there has been empirical study of Lean in relation to new-builds there is a need to analyse its applicability to other contexts, such as refurbishments. The effect of using Lean on the refurbishment of a municipal building in Germany is investigate… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
10
0

Year Published

2014
2014
2024
2024

Publication Types

Select...
4
4

Relationship

0
8

Authors

Journals

citations
Cited by 30 publications
(10 citation statements)
references
References 37 publications
0
10
0
Order By: Relevance
“…Despite the wider range of benefits, various challenges are encountered when implementing refurbishments. In general, refurbishing a building is a risky, complex, and less predictable task in the construction industry (Alwis et al, 2022), and has various issues which may be affected project participants and building occupants, compared to new construction (Bryde and Schulmeister, 2012;Ekanayake et al, 2018). For instance, managing refurbishment projects will encounter some unique problems when dealing with people, the project itself (Premachandra et al, 2019), and the environment (Lund et al, 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
See 2 more Smart Citations
“…Despite the wider range of benefits, various challenges are encountered when implementing refurbishments. In general, refurbishing a building is a risky, complex, and less predictable task in the construction industry (Alwis et al, 2022), and has various issues which may be affected project participants and building occupants, compared to new construction (Bryde and Schulmeister, 2012;Ekanayake et al, 2018). For instance, managing refurbishment projects will encounter some unique problems when dealing with people, the project itself (Premachandra et al, 2019), and the environment (Lund et al, 2016).…”
Section: Literature Reviewmentioning
confidence: 99%
“…The most common risks in refurbishments are characteristic uncertainty (Lund et al, 2016), because of their lack of information, space limitation for reconstruction projects, and maintaining safety and health which involves many players including building users. Moreover, it is challenging to assess the existing building and estimate its future performance (Ali et al, 2018) due to difficulties in working times (Bryde and Schulmeister, 2012;Zambotti et al, 2019)). Further, as revealed by Ali and Au-Yong (2022), the lack of involvement of responsible parties due to the lack of benefits received by them as financial sponsors (Zambotti et al, 2019) causes a lot of issues in building refurbishment projects.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Restoration activities are considered to have greater complexity compared with new constructions as a result of complex building data (Ali et al , 2008), to complex cost distribution (Buys and Miller, 2011) and broad interactions amongst stakeholders (Klotz and Horman, 2010). Difficult refurbishment projects are characterised by single to multi-level construction projects, whether newbuilds or otherwise, with particular user needs for multi-faceted constructions, complex properties, complexities in the layout of the site, the structural age, the participation of multiple organisations and stakeholders and extended structural history (Ali, 2014; Bryde and Schulmeister, 2012; Kemmer and Koskela, 2012). The implementation of an intricate construction project requires a novel input to resolve the related to structural and technical design aspects with unique purpose provisions, such as the co-operation between expert professionals to prepare the project paperwork and contract details (Killip, 2013; Li and Yang, 2014).…”
Section: Literature Reviewmentioning
confidence: 99%
“…Consequently this research investigates the potential of the application of lean concepts to alliance projects. Bryde and Schulmeister (2012) reviewed the literature on lean construction applications in different types of construction projects and pointed out that further empirical studies of lean principles in different contexts are still required. This study determines the extent to which the lean concept can be applied to projects executed using the alliance procurement system.…”
Section: Introductionmentioning
confidence: 99%