2015 European Control Conference (ECC) 2015
DOI: 10.1109/ecc.2015.7330551
|View full text |Cite
|
Sign up to set email alerts
|

Approximate closed-loop minimax model predictive operation control of microgrids

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

0
7
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
4
2
1

Relationship

2
5

Authors

Journals

citations
Cited by 10 publications
(7 citation statements)
references
References 19 publications
0
7
0
Order By: Relevance
“…The MPC approaches for islanded MGs in [10], [12] include power flow over the lines, power sharing of grid-forming units and curtailable renewable infeed. However, these approaches have been found to be overly conservative as they try to minimise the worst-case objective [10], [12].…”
Section: A Operation Control Of Mgsmentioning
confidence: 99%
See 3 more Smart Citations
“…The MPC approaches for islanded MGs in [10], [12] include power flow over the lines, power sharing of grid-forming units and curtailable renewable infeed. However, these approaches have been found to be overly conservative as they try to minimise the worst-case objective [10], [12].…”
Section: A Operation Control Of Mgsmentioning
confidence: 99%
“…To compensate for this lack of robustness, some authors have proposed worst-case MPC approaches for the operation of MGs. Uncertain parameters, such as model parameters [11] and forecasts [10], [12] are treated as bounded quantities and an MPC formulation is used to minimise the worst-case cost. The MPC approaches for islanded MGs in [10], [12] include power flow over the lines, power sharing of grid-forming units and curtailable renewable infeed.…”
Section: A Operation Control Of Mgsmentioning
confidence: 99%
See 2 more Smart Citations
“…Early works on deterministic MPC [1], [5], [6] are giving way to methods that take the associated uncertainty into consideration. Worst-case approaches [7], [8] can prove overly conservative, especially in presence of higly uncertain wind, irradiance and load. Expectation-based (risk-neutral) stochastic MPC formulations have been proposed involving either (typically independent) processes with continuous distributions [9] or scenario-based formulations [2].…”
Section: Introductionmentioning
confidence: 99%