1974
DOI: 10.3133/ofr74367
|View full text |Cite
|
Sign up to set email alerts
|

Artificial recharge through a well in fissured carbonate rock, West St. Paul, Minnesota

Abstract: The Prairie du Chien Group was injected with 2,754,000 gallons (368,200 cubic feet), or 10,430 cubic metres, of municipally treated water at about 100 gallons per minute (13.4 cubic feet per minute), or 6.3 litres per second, for 20 days. The injection-pipe system was deseed to utilize pipe friction rather than a remote-controlled valve in the well to maintain positive pressure and eliminate air entrainment in the injection water and the escape cf dissolved gasses from the water. During the 20-day injection pe… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

1986
1986
2011
2011

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 16 publications
0
1
0
Order By: Relevance
“…comm. (2005), 8 Heisig and Prince (1993) , 9 Ross Schmidt et al (2007) , 10 Passow (1996) , 11 Johnston (1993) , 12 O’Shea et al (1995) , 13 Brothers and Katzer (1990) , 14 Dillon et al (1997) , 15 Lacombe (1996) , 16 Reeder et al (1976) .…”
Section: Review Of Hydraulic Loading Ratesmentioning
confidence: 99%
“…comm. (2005), 8 Heisig and Prince (1993) , 9 Ross Schmidt et al (2007) , 10 Passow (1996) , 11 Johnston (1993) , 12 O’Shea et al (1995) , 13 Brothers and Katzer (1990) , 14 Dillon et al (1997) , 15 Lacombe (1996) , 16 Reeder et al (1976) .…”
Section: Review Of Hydraulic Loading Ratesmentioning
confidence: 99%