Pipelines 2007 2007
DOI: 10.1061/40934(252)80
|View full text |Cite
|
Sign up to set email alerts
|

Assessing PCCP Transmission Mains

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2010
2010
2011
2011

Publication Types

Select...
3
1

Relationship

0
4

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…However, employment of large diameter PCCPs also increased the financial and product loss risks associated with their failure. Several catastrophic drinking water transmission line ruptures illustrate this problem Galleher et al, 2007;Padewski at al., 2007). In 2006, The San Diego Water Authority quickly responded to a rupture in a 243.84 cm (96 inches) line (Galleher et al, 2007).…”
Section: Pccp Analysismentioning
confidence: 99%
“…However, employment of large diameter PCCPs also increased the financial and product loss risks associated with their failure. Several catastrophic drinking water transmission line ruptures illustrate this problem Galleher et al, 2007;Padewski at al., 2007). In 2006, The San Diego Water Authority quickly responded to a rupture in a 243.84 cm (96 inches) line (Galleher et al, 2007).…”
Section: Pccp Analysismentioning
confidence: 99%