Assessing the Implementation of Best Productivity Practices in Maintenance Activities, Shutdowns, and Turnarounds of Petrochemical Plants

Abstract: This paper describes the development of a method to assess the level of implementation of best productivity practices in the petrochemical industry. The proposed methodology focuses on construction, maintenance activities, shutdowns, and turnarounds. Its novelty and importance are emphasized by the lack of productivity studies that target these types of projects. This article reports the research methodology steps including tool development and detailed case study assessments of projects in Singapore. The appr… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
4
0

Year Published

2021
2021
2024
2024

Publication Types

Select...
4
1

Relationship

1
4

Authors

Journals

citations
Cited by 5 publications
(4 citation statements)
references
References 34 publications
0
4
0
Order By: Relevance
“…The demographic information of participants such as, qualifications, level of expertise, job class, industry, years of experience, size of organization, staff turnover, and locations were gathered in the first section of the questionnaire. The later section of the questionnaire covered MoOSTs related questions such as, drivers for performing MoOSTs, causes of delays, estimated use of contracted services, MoOSTs frequency, MoOSTs budget, common approaches for documenting lessons learned, approximations of targeted performances of MoOSTs, based on duration and cost objectives [65][66][67][68]. Furthermore, during the semi-structured interviews, each participant was asked open ended questions, some of which were earlier presented in the survey as close-ended questions.…”
Section: Methodsmentioning
confidence: 99%
“…The demographic information of participants such as, qualifications, level of expertise, job class, industry, years of experience, size of organization, staff turnover, and locations were gathered in the first section of the questionnaire. The later section of the questionnaire covered MoOSTs related questions such as, drivers for performing MoOSTs, causes of delays, estimated use of contracted services, MoOSTs frequency, MoOSTs budget, common approaches for documenting lessons learned, approximations of targeted performances of MoOSTs, based on duration and cost objectives [65][66][67][68]. Furthermore, during the semi-structured interviews, each participant was asked open ended questions, some of which were earlier presented in the survey as close-ended questions.…”
Section: Methodsmentioning
confidence: 99%
“…Similarly, Krishnankutty et al [1] embraced a decision matrix to expand the scope of improvement for contractors and plant owners during the TAM. Their study revealed that auxiliary activities, including preparation, transportation, and material handling, absorbed substantial on-site work hours.…”
Section: Improve Tam Efficiency With Assessment Toolsmentioning
confidence: 99%
“…Process plants are one of the topics that many researchers have devoted their time to exploring, with process plants covering a wide range of industries, such as petrochemicals, oil and gas, power plants, and food production. These studies address vital areas, such as the design, fabrication, and material selection of plant equipment, as well as construction procedures, testing requirements, safe operating practices, maintenance strategies, and overall operational efficiency [1][2][3][4][5].…”
Section: Introductionmentioning
confidence: 99%
“…Hwang et al [17] identified and prioritized the critical management strategies that can help improve productivity in the construction industry of Singapore. Although great efforts are made both by the practice and academia, the productivity of Singapore's construction industry is still low [18,19]. Hence, it is imperative to review and evaluate the practices conducted for improving construction productivity in Singapore.…”
mentioning
confidence: 99%