Assessment and analysis of different process bus redundancy networks performance for IEC61850‐based digital substation

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
4
1

Citation Types

0
6
0

Year Published

2019
2019
2022
2022

Publication Types

Select...
4
3

Relationship

0
7

Authors

Journals

citations
Cited by 10 publications
(6 citation statements)
references
References 7 publications
0
6
0
Order By: Relevance
“…The IDMT curve was obtained in any one phase according to the IED time of operation with injected increasing values of the fault currents while keeping the other two phase currents undisturbed. The substation rated current, trip current, and increasing values of trip currents injected from the omicron test kit are given in Equations ( 9)- (11).…”
Section: Testing Ied Overcurrent Protectionmentioning
confidence: 99%
See 1 more Smart Citation
“…The IDMT curve was obtained in any one phase according to the IED time of operation with injected increasing values of the fault currents while keeping the other two phase currents undisturbed. The substation rated current, trip current, and increasing values of trip currents injected from the omicron test kit are given in Equations ( 9)- (11).…”
Section: Testing Ied Overcurrent Protectionmentioning
confidence: 99%
“…Many studies have tested model interoperability using simulation software platforms. IEC-61850-based substation communications using software platforms with python coding [10], optimized network engineering tools (OPNET) simulation software [11], Victoria university zone substation (VUZS) simulator [12], and virtual IEDs using MATLAB [13] represent certain simulation result analyses of digital substations.…”
Section: Introductionmentioning
confidence: 99%
“…In the substation, the monitoring, control, protection and other automation functions are provided by the Substation Automation System (SAS). The communication network within the substation is divided into three levels: station level, bay level and process level [2]. NCIT and Merging Unit are located on the process level.…”
Section: Introductionmentioning
confidence: 99%
“…At present, active work is under way to develop and introduce digital substations based on modern micro-processing control and relay modules with digital current and voltage instrument (optical) transformers [1,2,3]. Leading relay protection manufacturers have already successfully developed and launched production of microprocessor relay protection modules adapted to work with digital flows, using process buses according to Standard 61850-9-2LE.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation