2014
DOI: 10.1016/j.esd.2013.12.007
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of decentralized hybrid PV solar-diesel power system for applications in Northern part of Nigeria

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

3
86
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
6
2

Relationship

0
8

Authors

Journals

citations
Cited by 182 publications
(89 citation statements)
references
References 23 publications
3
86
0
Order By: Relevance
“…Hybrid system for Biret using HOMER simulation . Source: Simulation by HOMER factor in this digital implantation is related to the estimated lifetime of the project, which is generally estimated for 25 years (Adaramola et al, 2014). The calculations presented by the software take into account values such as interest capital, depreciation, operating costs, fuel costs.…”
Section: The Hybrid Plant In Biretmentioning
confidence: 99%
“…Hybrid system for Biret using HOMER simulation . Source: Simulation by HOMER factor in this digital implantation is related to the estimated lifetime of the project, which is generally estimated for 25 years (Adaramola et al, 2014). The calculations presented by the software take into account values such as interest capital, depreciation, operating costs, fuel costs.…”
Section: The Hybrid Plant In Biretmentioning
confidence: 99%
“…The OPEX on sites powered by DG alone is higher than that in hybrid powered sites. Carbon footprint savings of 30~75% are also achieved as a result of the reduction in the burning of fossil fuel [29][30][31][32][33][34][35]. (2) A 50% reduction in OPEX of traditional energy source (DG) and above [33,36].…”
Section: Introductionmentioning
confidence: 99%
“…This provides a gap in knowledge about costing variables necessary for the analysis of projects. Adaramola et al, 2014 authored a highly cited assessment of off-grid PV solar-diesel power systems for use in Nigeria that assumed capital costs of different technologies would be similar to those advertised on local market watch website (Muyiwa S. Adaramola, 2014). Similar websites exist in Australia due to the competition in the industry of PV panels, inverters and batteries; making up-to-date market prices easily accessible.…”
Section: Solar Pv Systemmentioning
confidence: 99%
“…Adaramola et al, 2014 assume a 10% hourly spinning reserve is sufficient for their system as well as 25% of the current renewable energy output (Muyiwa S. Adaramola, 2014). This assumption is also used for the Lord Howe Island project and various HOMER simulations in international countries (David Pollington, 2015, p. 84) (Lanre Olatomiwa, 2015, p. 442).…”
Section: Diesel Generatormentioning
confidence: 99%
See 1 more Smart Citation