2014
DOI: 10.1002/prs.11719
|View full text |Cite
|
Sign up to set email alerts
|

Assessment of the likelihood of exceeding the flare capacity of multiple LNG processing trains

Abstract: Flare systems are typically designed to meet recognized and generally accepted good engineering practice for foreseeable vent and relief scenarios. API 521 [American Petroleum Institute, ANSI/API Standard 521 Guide for Pressure‐Relieving and Depressuring Systems: Petroleum Petrochemical and Natural Gas Industries, Fifth Edition, American Petroleum Institute, 2007] allows for multitrain units to be protected by the same flare system. Therefore, these systems must be reliable, available, auditable, and maintaina… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2016
2016
2022
2022

Publication Types

Select...
2

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…Standard reliability data sources [ 27 ] can provide some common reliability data. Lopez [ 28 ] used the standard reliability data sources to confirm the probability of base event (BE) of FTA in liquefied natural gas (LNG) industry. Similarly, Khakzad [ 24 ] confirmed the failure probability in bow-tie analysis of a mixing tank system by referring to the standard reliability data sources.…”
Section: Introductionmentioning
confidence: 99%
“…Standard reliability data sources [ 27 ] can provide some common reliability data. Lopez [ 28 ] used the standard reliability data sources to confirm the probability of base event (BE) of FTA in liquefied natural gas (LNG) industry. Similarly, Khakzad [ 24 ] confirmed the failure probability in bow-tie analysis of a mixing tank system by referring to the standard reliability data sources.…”
Section: Introductionmentioning
confidence: 99%