2013
DOI: 10.1049/iet-gtd.2013.0042
|View full text |Cite
|
Sign up to set email alerts
|

Authenticated voltage control of partitioned power networks with optimal allocation of STATCOM using heuristic algorithm

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
1
1

Citation Types

1
17
0
2

Year Published

2014
2014
2020
2020

Publication Types

Select...
6
1

Relationship

0
7

Authors

Journals

citations
Cited by 25 publications
(20 citation statements)
references
References 19 publications
1
17
0
2
Order By: Relevance
“…Z s represents the series impedance of T s , while Z sh represents the shunt impedance of T sh , and an auxiliary bus (k) represents the terminal of the UPFC. It is worth to mention that modeling UPFC into Newton Raphson load flow based on voltage source modeling needs complex modifications in the Jacobin, the correction, and the mismatch matrices to incorporate the parameters of the UPFC as state variables which include ΔV s , ΔV sh , Δθ s , and Δθ sh as (1) where F is the main Jacobian matrix of NR power flow, while F 1 , F 2 , and F 3 are submatrices of devices equations. B is the main mismatch matrix of the NR power flow, while B 1 is the mismatch of control device equations.…”
Section: Modeling Of Upfcmentioning
confidence: 99%
“…Z s represents the series impedance of T s , while Z sh represents the shunt impedance of T sh , and an auxiliary bus (k) represents the terminal of the UPFC. It is worth to mention that modeling UPFC into Newton Raphson load flow based on voltage source modeling needs complex modifications in the Jacobin, the correction, and the mismatch matrices to incorporate the parameters of the UPFC as state variables which include ΔV s , ΔV sh , Δθ s , and Δθ sh as (1) where F is the main Jacobian matrix of NR power flow, while F 1 , F 2 , and F 3 are submatrices of devices equations. B is the main mismatch matrix of the NR power flow, while B 1 is the mismatch of control device equations.…”
Section: Modeling Of Upfcmentioning
confidence: 99%
“…Clustering Criterion: At this stage -means is used to assign the nodes into clusters. -means iteratively minimizes the objective function: (25) where accounts for the distance between a node and a cluster centroid . This optimization iterates until the movement of the -centroid points falls below some minimum threshold or a maximum number of iterations is reached.…”
Section: Clusteringmentioning
confidence: 99%
“…Contradicting its motivation it uses geographical shortest paths as a distance metric between load nodes and generation, which is unsound and computationally prohibitive for realistic size networks. Fuzzy logic has also been used to identify voltage control zones [24], [25] where each node has a degree of belonging rather than belonging completely to one zone, prior to crisp clustering. An approach using fuzzy -means is introduced in [25], and has demonstrated robustness for various operating conditions in the network.…”
Section: Introductionmentioning
confidence: 99%
See 1 more Smart Citation
“…Estos dispositivos intercambian corriente reactiva capacitiva o inductiva [5]. Por otro lado, los Statcom (Static Synchronous Compensator) son un tipo de Facts más avanzado, cuya corriente reactiva de intercambio no depende de la tensión a la que está conectado [6]. El compensador serie controlado por tiristores (sigla-TCSC) es un Facts que permite un ajuste rápido y continuo de la impedancia en una línea de transmisión, y su estructura básica consta de un banco de condensadores en paralelo con un reactor TCR (Thyristor controlled reactor) [7].…”
Section: Introductionunclassified