1999
DOI: 10.2136/sssaj1999.634977x
|View full text |Cite
|
Sign up to set email alerts
|

Automated Microstandpipe System for Soil Erosion Research

Abstract: The influence of soil water on erosion is well known, but the full effect of variations in water conditions on erosional processes has only recently been recognized. Micro time domain reflectometer (TDR) probes and microtensiometers have provided some precise temporal and spatial data necessary for soil erosion models, but data on local water table dynamics are also needed to explain rill incision and network development processes. An automated multiprobe microstandpipe system we developed provides continuous … Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3
2

Citation Types

0
13
0

Year Published

2000
2000
2011
2011

Publication Types

Select...
5

Relationship

1
4

Authors

Journals

citations
Cited by 6 publications
(13 citation statements)
references
References 32 publications
0
13
0
Order By: Relevance
“…Thus, TDR was useful for indicating water contents before saturation and standpipes for indicating water table levels after saturation. Correlation of microstandpipe and TDR data gives accurate and precise indication of actual water levels (Rockwell, 1995;Bryan et al, 1999). Infiltrating wetting front depth was also measured with manual scales, every 2-3 min, at the transparent flume wall.…”
Section: Flume Data Collectionmentioning
confidence: 99%
See 4 more Smart Citations
“…Thus, TDR was useful for indicating water contents before saturation and standpipes for indicating water table levels after saturation. Correlation of microstandpipe and TDR data gives accurate and precise indication of actual water levels (Rockwell, 1995;Bryan et al, 1999). Infiltrating wetting front depth was also measured with manual scales, every 2-3 min, at the transparent flume wall.…”
Section: Flume Data Collectionmentioning
confidence: 99%
“…Design and construction is described fully in Rockwell (1995) and Bryan et al (1999). Standpipes were emplaced 0Ð25 m from the flume wall, as near to the central channel as practical without directly disturbing flow, at distances 0Ð25, 0Ð5, 0Ð75, 1Ð25, 1Ð75, 2Ð5, 3Ð5, 5Ð5, 7Ð5 and 9Ð5 m upflume from the weir.…”
Section: Flume Data Collectionmentioning
confidence: 99%
See 3 more Smart Citations