2019
DOI: 10.1016/j.epsr.2019.105925
|View full text |Cite
|
Sign up to set email alerts
|

Automatic restoration of large-scale distribution networks with distributed generators, voltage control devices and heating loads

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
11
0
7

Year Published

2020
2020
2024
2024

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 16 publications
(18 citation statements)
references
References 31 publications
0
11
0
7
Order By: Relevance
“…This characteristic favors the simplification of these sections as single elements to facilitate the problem resolution since the solution basically consists of deciding which switches must be operated for restoration, not including decisions regarding the internal structure of the sections. A classical representation in the literature is simplifying the topology of the EDS in load blocks and switchable lines [25], [30]. However, it is necessary to comply with operational requirements within the sections; thus the restoration methods must allow the assessment of the operational conditions of the EDS in full.…”
Section: Discussionmentioning
confidence: 99%
See 1 more Smart Citation
“…This characteristic favors the simplification of these sections as single elements to facilitate the problem resolution since the solution basically consists of deciding which switches must be operated for restoration, not including decisions regarding the internal structure of the sections. A classical representation in the literature is simplifying the topology of the EDS in load blocks and switchable lines [25], [30]. However, it is necessary to comply with operational requirements within the sections; thus the restoration methods must allow the assessment of the operational conditions of the EDS in full.…”
Section: Discussionmentioning
confidence: 99%
“…Although these EDSs are not very large in relation to the number of buses, the expressive number of switches makes the problem very complex. When tests are carried out with switches in all lines, the system becomes highly more complex than a typical EDS, which usually has around 10% to 25% of switchable lines [8], [30]. In [8], e.g., a 416-bus EDS has 446 branches and 97 switches, a percentage of 22%.…”
Section: Introductionmentioning
confidence: 99%
“…Isto acontece em razão de esse problema apresentar, em geral, funções objetivos difíceis de serem expressas de uma forma precisa e que são, em geral, não suaves, pois possuem muitas não-linearidades e descontinuidades. Além disso, o elevado número de variáveis do problema pode levar a uma explosão combinatória, dificultando ainda mais a utilização de programação matemática para SDs de grande porte (com milhares de linhas, barras de carga e chaves seccionadoras) (CAMILLO et al, 2016)(CARRANO et al, 2016MANTOVANI, 2019).…”
Section: Panorama Geralunclassified
“…Entretanto, a norma IEEE Std 1547 (IEEE, 2018) incentiva a operação de microrredes de modo ilhado, tornando possível a redução do número de setores restauráveis. Na literatura estão presentes diversos trabalhos com diferentes abordagens (PERALTA; LEITE; MANTOVANI, 2019;CHEN et al, 2018b;HUANG;YANG;TAYLOR, 2016) para os geradores localizados na região restaurável afetada pela falta. Com base nos estudos realizados optou-se neste trabalho pelos dois tipos de geradores:…”
Section: Situaçãounclassified
See 1 more Smart Citation