2006 IEEE/PES Transmission &Amp; Distribution Conference and Exposition: Latin America 2006
DOI: 10.1109/tdcla.2006.311494
|View full text |Cite
|
Sign up to set email alerts
|

Availability & Reliability Evaluation of Dokan Hydro Power Station

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
9
0

Year Published

2011
2011
2024
2024

Publication Types

Select...
7
2

Relationship

0
9

Authors

Journals

citations
Cited by 20 publications
(9 citation statements)
references
References 2 publications
0
9
0
Order By: Relevance
“…As per the markov three state model, hydropower are guided by two undesirable event i.e Scheduled outage and Forced outage. Scheduled outage covers all the planned events due to which hydropower unable to deliver electricity and Forced outage covers the events that are due to the failure in the components of hydropower [12] . The data such as failure rate and the mean downtime of past seven years of operation, were taken from the maintenance log sheet of the hydropower as provided by the management.…”
Section: Risk Score Through Ahp Based Ftamentioning
confidence: 99%
“…As per the markov three state model, hydropower are guided by two undesirable event i.e Scheduled outage and Forced outage. Scheduled outage covers all the planned events due to which hydropower unable to deliver electricity and Forced outage covers the events that are due to the failure in the components of hydropower [12] . The data such as failure rate and the mean downtime of past seven years of operation, were taken from the maintenance log sheet of the hydropower as provided by the management.…”
Section: Risk Score Through Ahp Based Ftamentioning
confidence: 99%
“…Setting the values of different parameters as k A ¼ 0:05; k B ¼ 0:10; k C ¼ 0:02 and [21,27] in Eq. (29) then taking the inverse Laplace transform, we get the availability of the system as Now varying time unit t from 0 to 15 in Eq.…”
Section: Availability Analysismentioning
confidence: 99%
“…Table (5) gives the results of evaluation of the sensitivity index that calculated using equation ( 8) considering Rezgare substation as output node. The variation of IMP are given for different component reliabilities.…”
Section: A: Network Representationmentioning
confidence: 99%