2022
DOI: 10.3390/app12063187
|View full text |Cite
|
Sign up to set email alerts
|

Benchmarking Various Pseudo-Measurement Data Generation Techniques in a Low-Voltage State Estimation Pilot Environment

Abstract: Distribution system state estimation (DSSE) is a valuable step for DSOs toward tackling the challenges of transitioning to a more sustainable energy system and the evolution and proliferation of electric cars and power electronic devices. However, on the LV level, implementation has only taken place in a few pilot projects. In this paper, an LV DSSE method is presented and implemented in four real Hungarian LV supply areas, according to well-defined scenarios. Pseudo-measurement datasets are generated from AAC… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
3
0

Year Published

2022
2022
2024
2024

Publication Types

Select...
3
2
1

Relationship

1
5

Authors

Journals

citations
Cited by 7 publications
(5 citation statements)
references
References 24 publications
0
3
0
Order By: Relevance
“…As well as load forecasting proposals with methods of load estimation [10] and allocating profiles [11], Markov model [9]. Finally, it must be mentioned criteria based on learning such as Artificial Neural Networks [12][13][14], Relevance Vector Machine (RVM) [15], and clustering techniques [16].…”
Section: Pseudo-measurementsmentioning
confidence: 99%
“…As well as load forecasting proposals with methods of load estimation [10] and allocating profiles [11], Markov model [9]. Finally, it must be mentioned criteria based on learning such as Artificial Neural Networks [12][13][14], Relevance Vector Machine (RVM) [15], and clustering techniques [16].…”
Section: Pseudo-measurementsmentioning
confidence: 99%
“…Level 3 DCFCs could be set up in the third location due to high demand for access by locals, small businesses, and passing EV owners such as cars, buses, bicycles etc. The second case study considers the EVCS to be set up in the city center of Newcastle upon Tyne, which is a commercial area [23]. The first charging point could be located in a small car park.…”
Section: Case Studymentioning
confidence: 99%
“…Descriptions of Autodesign and Pandapowerare discussed in detail under section 2. The charging stations should be established in multiple different locations to ensure availability to the users as well [23 The project was aimed to in principle design/simulate an EVCS system using Northern Powergrid's AutoDesign tool [24][25][26][27][28][29][30] and simulate the impact of the system on the grid under different loads and the hourly EV demand. Furthermore, the resulting model is analyzed and the results are simulated using Pandapower.…”
Section: Introductionmentioning
confidence: 99%
“…Terefore, the engineering practice uses the so-called W measurement weight matrix. Békési et al [25] improved a state estimation process in which W is used.…”
Section: Connection With the Electrical Calculationmentioning
confidence: 99%