2019
DOI: 10.1016/j.cor.2019.06.006
|View full text |Cite
|
Sign up to set email alerts
|

Bi-objective short-term scheduling in a rolling horizon framework: a priori approaches with alternative operational objectives

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
4

Relationship

1
3

Authors

Journals

citations
Cited by 4 publications
(1 citation statement)
references
References 41 publications
0
1
0
Order By: Relevance
“…The model ( P ) has been constructed to easily accommodate some of the features of the particular application that we study. However, it is similar to other general process network scheduling models proposed such as in refs and , and was used to model a semiconductor processing plant in ref . In particular, the method for generating time grids for our model presented in section may be tailored slightly to fit the general batch scheduling model presented in ref .…”
Section: Introductionmentioning
confidence: 99%
“…The model ( P ) has been constructed to easily accommodate some of the features of the particular application that we study. However, it is similar to other general process network scheduling models proposed such as in refs and , and was used to model a semiconductor processing plant in ref . In particular, the method for generating time grids for our model presented in section may be tailored slightly to fit the general batch scheduling model presented in ref .…”
Section: Introductionmentioning
confidence: 99%