All Days 2006
DOI: 10.2118/102550-ms
|View full text |Cite
|
Sign up to set email alerts
|

Big Bore Completion and Sand Control for High Rate Gas Wells

Abstract: This paper outlines and discusses the issues surrounding the TOTAL AUSTRAL Carina and Aries field development project and the engineering issues addressed to facilitate achieving the project goals of producing gas at high rates from the shallow unconsolidated sand stone reservoirs. The main challenge in terms of completion architecture was to maximize the well head flowing pressure while insuring "long term integrity" of wells. This was addressed through implementation of limited - or even no… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2009
2009
2015
2015

Publication Types

Select...
4
1
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,18 of ultra-high rate gas wells which included nine (9) areas and over 130 wells. 16 This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower…”
Section: Feasibility Studymentioning
confidence: 99%
“…The primary scope of the study was to review existing developments to understand field proven designs. The study focused on a global review 2,3,4,5,6,7,8,9,10,11,12,13,14,15,18 of ultra-high rate gas wells which included nine (9) areas and over 130 wells. 16 This study, combined with the experiential knowledge of the team, resulted in a design that integrated the field proven lower…”
Section: Feasibility Studymentioning
confidence: 99%