2015
DOI: 10.1061/(asce)cp.1943-5487.0000342
|View full text |Cite
|
Sign up to set email alerts
|

BIM-Based Construction Scheduling Method Using Optimization Theory for Reducing Activity Overlaps

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
28
0
4

Year Published

2015
2015
2024
2024

Publication Types

Select...
3
3
2

Relationship

0
8

Authors

Journals

citations
Cited by 58 publications
(32 citation statements)
references
References 19 publications
0
28
0
4
Order By: Relevance
“…The developed system is intended for the very early stages of projects, even before the structural system of the project is specified. More recently, Moon et al [22] developed a BIM-based construction scheduling method which employs optimization theory with the objective of reducing activity overlaps. Their main focus with respect to BIM was on visualization and did not encompass the concept of BIM-based scheduling.…”
Section: Bim-based Schedulingmentioning
confidence: 99%
“…The developed system is intended for the very early stages of projects, even before the structural system of the project is specified. More recently, Moon et al [22] developed a BIM-based construction scheduling method which employs optimization theory with the objective of reducing activity overlaps. Their main focus with respect to BIM was on visualization and did not encompass the concept of BIM-based scheduling.…”
Section: Bim-based Schedulingmentioning
confidence: 99%
“…Redução do retrabalho (MENDES et al, 2014;SAINI;MHASKE, 2013;PITAKE;PATIL, 2013;FENG;CHEN;HUANG, 2010;LI et al,2009;MOON, H. et al,2013;SAAD et al, 2015;WANG;LEITE, 2012;MATTHEWS et al, 2015) 25% Redução do tempo de obras (MENDES et al, 2014;SAINI;MHASKE, 2013;PITAKE;PATIL, 2013;FENG;CHEN;HUANG, 2010;LI et al,2009;MOON, H. et al,2013;SAAD et al, 2015;WANG;LEITE, 2012) 25% Análises e alocação de recursos mais eficientes associado à estimativa de produtividade KIM et al, 2013;ISATTO, 2012;LIU et al, 2014;LI et al, 2009;MOON et al, 2013;SAAD et al, 2015;WANG;LEITE, 2012) 22%…”
Section: %unclassified
“…Auxilia na identificação de recursos sobrecarregados (MOON et al, 2013;LIU et al, 2014) Fonte: Os autores.…”
Section: %unclassified
“…Construction scheduling is a critical task in construction project management (Moon 2013). However, most construction schedules are still being generated manually, which requires a huge amount of time .…”
Section: Introductionmentioning
confidence: 99%