“…In essence, BIM utilisation is almost entirely restricted to the design and construction phases of a building's development vis-a-vis the O&M phase (Volk et al, 2014, Wetzel and Thabet, 2015, Shalabi and Turkan, 2016, Pishdad-Bozorgi, 2017. To address this problem, attempts to expand research within the field of BIM4FM have only recently intensified (Yalcinkaya and Singh, 2014, Ilter and Ergen, 2015, Kassem et al, 2015. Amongst various research themes investigated, the issue of identifying what information and data to be prepared and handed over is a conspicuous variable affecting BIM4FM (Ilter and Ergen, 2015).…”