2019
DOI: 10.1051/e3sconf/201910501043
|View full text |Cite
|
Sign up to set email alerts
|

Calculation of Boundary Stripping Ratio Errors at the Stage of Quarries Designing

Abstract: The open pit mining method of solid minerals extracting is widely used both in Russia and in the whole world, and sets a general direction of mining industry development as its main tool, at least for the next decades. This is due to its significant advantages compared with other methods of minerals extraction, especially with underground method. This conclusion is made considering production capacity of mining and enrichment enterprises, mining safety, productivity and working conditions, investment and opera… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2020
2020
2023
2023

Publication Types

Select...
6

Relationship

2
4

Authors

Journals

citations
Cited by 7 publications
(4 citation statements)
references
References 2 publications
0
4
0
Order By: Relevance
“…Of course, the determination of the boundaries of open pit mining should be carried out taking into account the conditions of stability of the massif of boundary rocks, which are performed by modern remote methods [17,18]. When determining the boundaries of the open pits according to known calculation principles, the economic calculating ratio is calculated according to technical and economic indicators, which are achieved at the time of design and its value is constant [19][20][21].…”
Section: Object and Methods Of Researchmentioning
confidence: 99%
“…Of course, the determination of the boundaries of open pit mining should be carried out taking into account the conditions of stability of the massif of boundary rocks, which are performed by modern remote methods [17,18]. When determining the boundaries of the open pits according to known calculation principles, the economic calculating ratio is calculated according to technical and economic indicators, which are achieved at the time of design and its value is constant [19][20][21].…”
Section: Object and Methods Of Researchmentioning
confidence: 99%
“…However, the existing methods of determining the cutoff overburden ratio [16][17][18] do not take into account the competitiveness of the iron ore products of the designed enterprise in the world market.…”
Section: Object and Methods Of Researchmentioning
confidence: 99%
“…The consequence of which is the accumulation of overburden backlog at enterprises, the occurrence of unscheduled temporarily non-working sides at the expense of the violation of the principle of proportional conduct of work and the development of the open-pit space, as well as the formation of temporarily non-working sides in the mining zone, which is unacceptable. Periodically, but inevitably, there is a need to revise previous projects due to the deviation of the actual state of mining operations from the design solutions [15,16]. Therefore, the mining development strategy should take into account the possibility and mechanisms of adaptive adjustment of the intensity of deposit development when the demand for commodity products changes, both at the level of an individual open-pit or a group of mine pits, and at the level of a group of mines that are part of the same company.…”
Section: Management Strategy Of An Open-pit Groupmentioning
confidence: 99%