2007
DOI: 10.1007/s00170-006-0753-6
|View full text |Cite
|
Sign up to set email alerts
|

Cell formation with alternative process routings and machine reliability consideration

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1

Citation Types

0
4
0

Year Published

2007
2007
2021
2021

Publication Types

Select...
8

Relationship

0
8

Authors

Journals

citations
Cited by 45 publications
(4 citation statements)
references
References 32 publications
0
4
0
Order By: Relevance
“…However, it is well known that in advanced manufacturing systems a task can be processed following alternative process routings (APR). Alternative process routing is widely considered in cellular manufacturing (Ameli and Arkat 2008;Eguia et al 2017;Kusiak 1987) but it has not been investigated in Cloud manufacturing. Considering APR for each task makes the model realistic and may enhance the flexibility of CMfg and reach the optimal performance of the system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…However, it is well known that in advanced manufacturing systems a task can be processed following alternative process routings (APR). Alternative process routing is widely considered in cellular manufacturing (Ameli and Arkat 2008;Eguia et al 2017;Kusiak 1987) but it has not been investigated in Cloud manufacturing. Considering APR for each task makes the model realistic and may enhance the flexibility of CMfg and reach the optimal performance of the system.…”
Section: Literature Reviewmentioning
confidence: 99%
“…Mean time between failures (MTBF) is a common way of dealing with a machine's reliability concern in the design phase of a manufacturing system (Jabal Ameli and Arkat, 2008). Thus,…”
Section: Proposed Pm Planning Proceduresmentioning
confidence: 99%
“…Hence, it is crucial to consider reliability and break down of the machines for having an efficient manufacturing system. Ameli and Arkat (2008) expressed that, reliability can be modeled as machine repair cost or production time delay cost. In addition, for modeling the possibility of failure in machine and system, there is two type of distribution are used which are as follows:…”
Section: Reliability In Cmsmentioning
confidence: 99%
“…Moreover, Ameli and Arkat (2008) proposed a mathematical method for calculating the machine breakdown cost. The breakdown cost is gained via dividing the production time by the mean time between the failure and then multiplying this quantity by the machine breakdown cost.…”
Section: Reliability In Cmsmentioning
confidence: 99%