2016
DOI: 10.1016/j.epsr.2016.06.043
|View full text |Cite
|
Sign up to set email alerts
|

Challenges for the Baltic Power System connecting synchronously to Continental European Network

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2018
2018
2023
2023

Publication Types

Select...
3
2
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(1 citation statement)
references
References 1 publication
0
1
0
Order By: Relevance
“…Two HVDC cables-Estlink 1 and Estlink 2-connect Estonia to Finland with 350 MW and 650 MW capacities, respectively. Lithuania is connected to Sweden through Nordbalt link, with a 700 MW capacity, while the 500 MW Litpol link1 connects Lithuania to Poland [3]. A Litpol link2, with 500 MW Sweden, and Switzerland.…”
Section: Introductionmentioning
confidence: 99%
“…Two HVDC cables-Estlink 1 and Estlink 2-connect Estonia to Finland with 350 MW and 650 MW capacities, respectively. Lithuania is connected to Sweden through Nordbalt link, with a 700 MW capacity, while the 500 MW Litpol link1 connects Lithuania to Poland [3]. A Litpol link2, with 500 MW Sweden, and Switzerland.…”
Section: Introductionmentioning
confidence: 99%