2012
DOI: 10.4028/scientific5/amr.446-449.1869
|View full text |Cite
|
Sign up to set email alerts
|

Characteristics of Settlement and Assessment Methods of Engineered Structures under Certain High-Speed Railway Tracks in China

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2024
2024
2024
2024

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…According to the “The Global Climate In 2015–2019” released by the World Meteorological Organization and the “2019 China Climate Bulletin” released by the China Climate Center, with global warming, extreme rainfall events are increasingly frequent in China. Under the action of high-frequency train loads, the subgrade is more prone to various defects such as settlement 5 , uplift deformation 6 , 7 , frost damage 8 , and mud pumping 9 . The occurrence of these defects is uncertain and poses a significant threat to human life and property.…”
Section: Introductionmentioning
confidence: 99%
“…According to the “The Global Climate In 2015–2019” released by the World Meteorological Organization and the “2019 China Climate Bulletin” released by the China Climate Center, with global warming, extreme rainfall events are increasingly frequent in China. Under the action of high-frequency train loads, the subgrade is more prone to various defects such as settlement 5 , uplift deformation 6 , 7 , frost damage 8 , and mud pumping 9 . The occurrence of these defects is uncertain and poses a significant threat to human life and property.…”
Section: Introductionmentioning
confidence: 99%