2006
DOI: 10.3182/20060830-2-sf-4903.00029
|View full text |Cite
|
Sign up to set email alerts
|

Closed Loop Dynamic Optimization of Production Plants

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2022
2022
2022
2022

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 0 publications
0
1
0
Order By: Relevance
“…In a RTO study, measurements are used before each optimization run. The measurements are performed directly on the facility to be optimized (Vettenranta et al, 2006), but for research studies a prototype (Alonso et al, 2013),…”
Section: Measurementsmentioning
confidence: 99%
“…In a RTO study, measurements are used before each optimization run. The measurements are performed directly on the facility to be optimized (Vettenranta et al, 2006), but for research studies a prototype (Alonso et al, 2013),…”
Section: Measurementsmentioning
confidence: 99%