2014
DOI: 10.1061/(asce)gt.1943-5606.0001064
|View full text |Cite
|
Sign up to set email alerts
|

Closure to “Pile Setup in Cohesive Soil. I: Experimental Investigation” by Kam W. Ng, Matthew Roling, Sherif S. AbdelSalam, Muhannad T. Suleiman, and Sri Sritharan

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
3

Citation Types

0
3
0

Year Published

2020
2020
2020
2020

Publication Types

Select...
1
1

Relationship

0
2

Authors

Journals

citations
Cited by 2 publications
(3 citation statements)
references
References 3 publications
0
3
0
Order By: Relevance
“…The cross-section view of the location of the strain gages and accelerometers is given in Figure 6-6. Notice that the accelerometers are on opposite sides of the web of the pile as was done by Ng et al (2011). The data gathered by the PDA equipment was wirelessly transmitted to the PDA unit, same as for the UHPC test piles.…”
Section: Hp 10 X 57 Production Pilesmentioning
confidence: 99%
See 2 more Smart Citations
“…The cross-section view of the location of the strain gages and accelerometers is given in Figure 6-6. Notice that the accelerometers are on opposite sides of the web of the pile as was done by Ng et al (2011). The data gathered by the PDA equipment was wirelessly transmitted to the PDA unit, same as for the UHPC test piles.…”
Section: Hp 10 X 57 Production Pilesmentioning
confidence: 99%
“…The CAPWAP analysis was completed using a Case damping factor of 0.166. (Ng et al 2011) The vertical load test that was performed on P3, which was 10 feet shorter than UW1-2 produced a vertical capacity of 296.5 kips. P3 and UW1-2 are comparable in length because the 10-ft reduction in length of P3 was to account for the prebore hole of UW1-2.…”
Section: Uhpc Production Pilementioning
confidence: 99%