Underground. The Way to the Future 2013
DOI: 10.1201/b14769-31
|View full text |Cite
|
Sign up to set email alerts
|

CO2 emissions during the construction of a large diameter tunnel with a slurry shield TBM

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
7
0

Year Published

2017
2017
2024
2024

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 6 publications
(8 citation statements)
references
References 4 publications
0
7
0
Order By: Relevance
“…Further, to obtain an accurate result for carbon emissions, it is necessary to use the input-output method to revise the process analysis method, adopting the above methods to calculate the same ring carbon emissions in an interval; and according to the calculation results, to revise the carbon emissions factors. Equations (1)-( 5) provide the basic formula for the modified process analysis method of calculation [24].…”
Section: Calculation Methodsmentioning
confidence: 99%
See 1 more Smart Citation
“…Further, to obtain an accurate result for carbon emissions, it is necessary to use the input-output method to revise the process analysis method, adopting the above methods to calculate the same ring carbon emissions in an interval; and according to the calculation results, to revise the carbon emissions factors. Equations (1)-( 5) provide the basic formula for the modified process analysis method of calculation [24].…”
Section: Calculation Methodsmentioning
confidence: 99%
“…The construction CO 2 emissions are mainly the sum of CO 2 emissions from electricity consumption, water consumption and transportation. A large part of it is related to construction equipment, and the CO 2 emissions calculation of the equipment is mainly performed for the operation period during construction [24].…”
Section: Shield Tunnelingmentioning
confidence: 99%
“…Choosing the right model for operating and maintaining the equipment not only determines the tunnel construction schedule, but also directly affects the safety of personnel at the construction site. Equipment risks include failure of the pipe assembly, failure of the jacking system, failure of the grouting system, mismatch of the operation model selection, consumption of disc cutters, and failure of the shield tail seal [1,7,13].…”
Section: Equipment Riskmentioning
confidence: 99%
“…A Tunnel Boring Machine (TBM) is a large-scale special type of equipment for modern tunnel construction that integrates machinery, electrical appliances, hydraulics, guidance, sensing, and information technology. Compared with the traditional drilling and blasting method, a TBM has the characteristics of being fast, being efficient, quality assurance, and high-level safety [1,2]. This provides advanced equipment and methods for the construction of long-distance water conveying tunnels under complex geological conditions [3,4], especially in conditions of tunnel with high geostress [5].…”
Section: Introductionmentioning
confidence: 99%
“…In order to measure the quantity of carbon emissions, the aforementioned factors have been studied and carbon emission models have been established based on different considerations and calculation methods. Based on the simulation methods applied, carbon emission models can be classified into average speed and operating condition models [1][2][3].…”
Section: Introduction Imentioning
confidence: 99%