SPE/IADC Drilling Conference 2007
DOI: 10.2118/105457-ms
|View full text |Cite
|
Sign up to set email alerts
|

Combination of Drilling With Casing and Stage Tool Cementing: A Unique Approach to Mitigating Downhole Conditions

Abstract: The gas fields of the western Piceance basin in northwestern Colorado present significant challenges to drilling and casing operations. This area has complex geology, with dipping formation beds that lead to "crooked hole" drilling. Fractured formations cause problems, including lost circulation while drilling, and failure to return cement to surface during primary cement jobs of the 9 5/8-in. casing. Sometimes casing cannot be run to total drilled depth. After review of the problems, an oper… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2009
2009
2011
2011

Publication Types

Select...
5
1

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 0 publications
0
2
0
Order By: Relevance
“…The stroke of the tool is engineered to fully displace the entire cutting structure to the annulus, which eventually is cemented in place. The center piston exposed is fully drillable with conventional roller-cone and PDC bits (a special bit or mill run is not required, thus eliminating a costly milling trip) (Robinson et al 2007) (see Fig. 6).…”
Section: Equipment Selectionmentioning
confidence: 99%
“…The stroke of the tool is engineered to fully displace the entire cutting structure to the annulus, which eventually is cemented in place. The center piston exposed is fully drillable with conventional roller-cone and PDC bits (a special bit or mill run is not required, thus eliminating a costly milling trip) (Robinson et al 2007) (see Fig. 6).…”
Section: Equipment Selectionmentioning
confidence: 99%
“…The center piston exposed is fully drillable with conventional roller-cone and PDC bits. A special bit or mill run is not required, thus eliminating a costly milling trip (Robinson et al 2007). Not only was liner drilling operations successful but DwL exceeded expectations in combating the wellbore instability problems associated with lost circulation and previous drilling operations in the A-3 well.…”
Section: Addressing Wellbore Instability and Lost Circulation In Framentioning
confidence: 99%