Construction Research Congress 2012 2012
DOI: 10.1061/9780784412329.031
|View full text |Cite
|
Sign up to set email alerts
|

Comparison of Design Risk Factors of Multistory Commercial Office Buildings

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2015
2015
2022
2022

Publication Types

Select...
5

Relationship

0
5

Authors

Journals

citations
Cited by 5 publications
(2 citation statements)
references
References 10 publications
0
2
0
Order By: Relevance
“…However, it stopped at the level of risk recognition and was not employed in the evaluation. In addition, various studies for safety management of construction sites have been conducted using BIM information, including the development of a method for recognizing hazards based on time information, and deriving a risk assessment system based on calculating the severity factor for the U.S. [34,35]. However, the risk assessment is limited to the level of risk recognition, so a separate method is required for risk rating estimation.…”
Section: Resultsmentioning
confidence: 99%
“…However, it stopped at the level of risk recognition and was not employed in the evaluation. In addition, various studies for safety management of construction sites have been conducted using BIM information, including the development of a method for recognizing hazards based on time information, and deriving a risk assessment system based on calculating the severity factor for the U.S. [34,35]. However, the risk assessment is limited to the level of risk recognition, so a separate method is required for risk rating estimation.…”
Section: Resultsmentioning
confidence: 99%
“…In particular, the SCSH rating system is designed to conduct quantitative risk assessment by providing a scoring template for risks that may occur within the project as well as at the construction site. In addition, a preliminary study for the risk assessment of each item of the Design for Construction Safety (DFCS) is also conducted to classify and quantify the design elements for each risk item [21]. Current studies on the automatic recognition of fall hazards and safety management based on BIM are being actively conducted [4,5].…”
Section: United Statesmentioning
confidence: 99%