2011
DOI: 10.1002/tee.21695
|View full text |Cite
|
Sign up to set email alerts
|

Composite dispatching rule design for dynamic scheduling with customer‐oriented production priority control

Abstract: In practice, the criteria considered for production scheduling objectives are generally derived from some desired production performance factors of a manufacturing system. On the other hand, customer-oriented production priority management focuses on the analysis of operational production management policies that cannot be readily measured in a quantitative manner. This paper presents an approach for multiobjective composite dispatching rule design, which simultaneously considers scheduling criteria and the cu… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1

Citation Types

0
2
0

Year Published

2017
2017
2023
2023

Publication Types

Select...
6

Relationship

0
6

Authors

Journals

citations
Cited by 7 publications
(2 citation statements)
references
References 21 publications
(33 reference statements)
0
2
0
Order By: Relevance
“…Thus, a lot of research effort has been made on the selection of dispatching rules with respect to three or four production objectives (Geiger et al, 2006;El-Bouri and Shah, 2006;Azadeh et al, 2012;Mouelhi-Chibani and Pierreval, 2010;Shiue, 2009;Baykasoglu et al, 2010;Scholz-Reiter et al, 2010;Heger et al, 2015;Chen et al, 2012;El-Bouri and Amin, 2015;Lin et al, 2008;Azadeh et al, 2015;Liu and Dong, 1996;Kızıl et al, 2006;Zhong et al, 2014;Shafiq et al, 2010;Joseph and Sridharan, 2011;Kashfi and Javadi, 2015).…”
Section: Model Retrieval and Combination For Dispatching Rule Modelsmentioning
confidence: 99%
“…Thus, a lot of research effort has been made on the selection of dispatching rules with respect to three or four production objectives (Geiger et al, 2006;El-Bouri and Shah, 2006;Azadeh et al, 2012;Mouelhi-Chibani and Pierreval, 2010;Shiue, 2009;Baykasoglu et al, 2010;Scholz-Reiter et al, 2010;Heger et al, 2015;Chen et al, 2012;El-Bouri and Amin, 2015;Lin et al, 2008;Azadeh et al, 2015;Liu and Dong, 1996;Kızıl et al, 2006;Zhong et al, 2014;Shafiq et al, 2010;Joseph and Sridharan, 2011;Kashfi and Javadi, 2015).…”
Section: Model Retrieval and Combination For Dispatching Rule Modelsmentioning
confidence: 99%
“…(2) How to design a new multi-agent-based real-time task allocation strategy to implement real-time scheduling based on real-time data in an IoT-based manufacturing environment. In the existing multi-agent-based dynamic scheduling methods, a dynamic scheduling approach focuses on dynamic dispatching rules [36] and event-driven rescheduling policies [37]. Between them, event-driven rescheduling policies are used by most of the methods.…”
Section: Introductionmentioning
confidence: 99%