Computation of milestones for decision support during system restoration

Abstract: System restoration involves status assessment, optimization of generation capability, and load pickup. The optimization problem needs to take complex constraints into consideration, and therefore, it is not practical to formulate the problem as one single optimization problem. The other critical consideration for the development of decision support tools is its generality, i.e., the tools should be portable from a system to another with minimal customization. This paper reports a practical methodology for cons… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

0
45
0

Year Published

2013
2013
2024
2024

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 27 publications
(45 citation statements)
references
References 20 publications
0
45
0
Order By: Relevance
“…Before calculating fitness value, the individual should be corrected if the topological constraint is not satisfied. The detailed correcting method can be found in Hou et al…”
Section: Optimization Of Power System Restoration Path Based On Orthomentioning
confidence: 99%
See 1 more Smart Citation
“…Before calculating fitness value, the individual should be corrected if the topological constraint is not satisfied. The detailed correcting method can be found in Hou et al…”
Section: Optimization Of Power System Restoration Path Based On Orthomentioning
confidence: 99%
“…The system restoration process consists of 3 stages: preparation, system restoration, and load recovery . The objectives and constraints of the 3 stages are different, and a multistage optimization model is usually used for system restoration . In the second stage, optimization of the restoration path is the foundation of system restoration and can accelerate system restoration.…”
Section: Introductionmentioning
confidence: 99%
“…To accomplish these GRMs, a series of detailed actions are necessary. For this purpose, the concept called Generic Restoration Actions (GRAs), which is proposed in [6], will be employed.…”
Section: Concept Of Generic Restoration Milestones (Grms)mentioning
confidence: 99%
“…For example, for fossil units, startup power requirement and critical maximal interval are necessary; for super-critical-once-through (SCOT) units, startup power requirement and critical minimum interval should be considered; for black start units, such as hydro units, startup power requirement and time from cranking to parallel are zero [5], [8]. A generic model of generating unit [6] may be illustrated as Fig. 1, and the parameters are listed in Table 1.…”
Section: Modeling Fcb Unit In Black Startmentioning
confidence: 99%
See 1 more Smart Citation