1988
DOI: 10.1080/00207548808947875
|View full text |Cite
|
Sign up to set email alerts
|

Computerized shop floor scheduling

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1
1

Citation Types

2
93
0
17

Year Published

1994
1994
2018
2018

Publication Types

Select...
5
4

Relationship

0
9

Authors

Journals

citations
Cited by 222 publications
(112 citation statements)
references
References 0 publications
2
93
0
17
Order By: Relevance
“…The importance of improving bottlenecks has been recognized and described by several authors [1][2][3][4]. However, the prerequisite for improving the bottleneck is to find the bottleneck in the first place (bottleneck detection).…”
Section: Bottleneck Fundamentals 21 Bottleneck Definitionsmentioning
confidence: 99%
“…The importance of improving bottlenecks has been recognized and described by several authors [1][2][3][4]. However, the prerequisite for improving the bottleneck is to find the bottleneck in the first place (bottleneck detection).…”
Section: Bottleneck Fundamentals 21 Bottleneck Definitionsmentioning
confidence: 99%
“…O TPC se desenvolveu pelas experiências de Goldratt com seu software OPT, ao identificar que nem todos os equipamentos necessitavam ser utilizados 100% do tempo (GOLDRATT, 1988). É considerado um princípio elementar da TOC, em que busca otimizar o sistema de produção conforme a capacidade de cada recurso (SOUZA, 2005).…”
Section: Tambor-pulmão-corda (Tpc)unclassified
“…Almost simultaneously, Goldratt introduced Optimised Production Technology (OPT), a scheduling software system accompanied by principles on how to manage bottlenecks; see e.g. Goldratt (1981Goldratt ( , 1988; Goldratt and Cox (1984); Goldratt and Fox (1986);and Spencer and Cox (1995). The book The Goal became famous and helped many firms to focus their bottlenecks, i.e.…”
Section: Mrp-based Systemsmentioning
confidence: 99%