2015
DOI: 10.1016/j.eswa.2015.07.044
|View full text |Cite
|
Sign up to set email alerts
|

Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement

Abstract: Abstract:Beginning with a variation of the sequencing problem in a mixed-products line (MMSP-W: Mixed-Model Sequencing Problem with Workload Minimization), we propose two new models that incorporate a set of working conditions in regard with human resources of workstations on the line. These conditions come from collective agreements and therefore must be respected by both company and labor unions. The first model takes into account the saturation limit of the workstations, and the second model also includes t… Show more

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1
1
1

Citation Types

0
3
0

Year Published

2016
2016
2023
2023

Publication Types

Select...
5
2

Relationship

2
5

Authors

Journals

citations
Cited by 17 publications
(3 citation statements)
references
References 25 publications
0
3
0
Order By: Relevance
“…Such consent agreement should be closely guided by the legal procedure and legal substance from the islamic viewpoints. Numbers of cases presented by Siti indicating the adjudication of cases on womens' right after divorce for example harta sepencarian, child maintenance, iddah maintenance drop-out on the basis of consensus reached by the paries to waived such rights which is prescribed by Islamic Law (Bautista et al, 2015;Zaini et al, 2017). Issue arose when parties i.e.…”
Section: Res Judicata Stands As Defencementioning
confidence: 99%
“…Such consent agreement should be closely guided by the legal procedure and legal substance from the islamic viewpoints. Numbers of cases presented by Siti indicating the adjudication of cases on womens' right after divorce for example harta sepencarian, child maintenance, iddah maintenance drop-out on the basis of consensus reached by the paries to waived such rights which is prescribed by Islamic Law (Bautista et al, 2015;Zaini et al, 2017). Issue arose when parties i.e.…”
Section: Res Judicata Stands As Defencementioning
confidence: 99%
“…Minimize the number of workers Worker task assignment: a worker can start a new task after the completion of the current task [5], "Consideration of human resources in the Mixed-model Sequencing Problem with Work Overload Minimization: Legal provisions and productivity improvement" Minimize total work overload Saturation limit: relationship between time used by the operator to carry out workload and the available time to work [18], "A comparative study of exact methods for the simple assembly line balancing problem"…”
Section: Literaturementioning
confidence: 99%
“…For a long mixed-model assembly line, an unpaced setting is more efficient than a paced setting [26]. Mixed-model assembly lines are much more prevalent than single-model or multi-model assembly lines because of mass customization [5]. Since paced assembly lines often use automated material handling (e.g., conveyor systems) and specialized workstations, it is more difficult to reassign resources (e.g., tasks and workers) in paced than in unpaced assembly lines.…”
Section: Scope Of Line Rebalancingmentioning
confidence: 99%