2021 IEEE PES Innovative Smart Grid Technologies Europe (ISGT Europe) 2021
DOI: 10.1109/isgteurope52324.2021.9640124
|View full text |Cite
|
Sign up to set email alerts
|

Consideration of Power Line Capacity and Impact on Voltage Band Compliance in Local Energy Markets

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
1

Citation Types

0
1
0

Year Published

2023
2023
2023
2023

Publication Types

Select...
1

Relationship

0
1

Authors

Journals

citations
Cited by 1 publication
(1 citation statement)
references
References 5 publications
0
1
0
Order By: Relevance
“…In contrast, Energy Supplier 2 has 120 consumers only (no other types of energy users) [36]. Nevertheless, the installed average capacity of the solar PV system is assumed to be 6 kWp per prosumer and the size of RBESS per prosumer is considered as 3.3 kW/10 kWh [37]. Under the proposed LEM platform, solar PVs, RBESSs, and load profiles are continuously monitored and predicted in the forward-facing trading market.…”
Section: Lem and Cbess-driven Microgrid: Overviewmentioning
confidence: 99%
“…In contrast, Energy Supplier 2 has 120 consumers only (no other types of energy users) [36]. Nevertheless, the installed average capacity of the solar PV system is assumed to be 6 kWp per prosumer and the size of RBESS per prosumer is considered as 3.3 kW/10 kWh [37]. Under the proposed LEM platform, solar PVs, RBESSs, and load profiles are continuously monitored and predicted in the forward-facing trading market.…”
Section: Lem and Cbess-driven Microgrid: Overviewmentioning
confidence: 99%