2009 23rd IEEE/NPSS Symposium on Fusion Engineering 2009
DOI: 10.1109/fusion.2009.5226367
|View full text |Cite
|
Sign up to set email alerts
|

Construction of Wendelstein 7-X - Engineering a steady state stellarator

Abstract: Abstract-The next step in the Wendelstein stellarator line is the large superconducting device Wendelstein 7-X, presently under construction in Greifswald. Steady-state operation is an intrinsic feature of stellarators, and one key element of the Wendelstein 7-X mission is to demonstrate steady-state operation at reactor relevant plasma conditions, as required for an economic fusion reactor. Such steady-state operation requires development of special technogies to be discussed in this paper.

Help me understand this report

Search citation statements

Order By: Relevance

Paper Sections

Select...
2
1
1
1

Citation Types

0
11
0

Year Published

2010
2010
2021
2021

Publication Types

Select...
5
1

Relationship

1
5

Authors

Journals

citations
Cited by 10 publications
(11 citation statements)
references
References 19 publications
0
11
0
Order By: Relevance
“…We can see how the (m, k) = (1, 6) is the dominant mode of the linear phase with smaller contributions from the (m, k) = (−1, 4) and (m, k) = (−1, 5) modes. The modes (1,8) and (1,11) are also present but with even smaller contributions. .…”
Section: 8mentioning
confidence: 99%
See 2 more Smart Citations
“…We can see how the (m, k) = (1, 6) is the dominant mode of the linear phase with smaller contributions from the (m, k) = (−1, 4) and (m, k) = (−1, 5) modes. The modes (1,8) and (1,11) are also present but with even smaller contributions. .…”
Section: 8mentioning
confidence: 99%
“…Constructing the structured meshes for the geometries considered in EVA is not a difficult task, even in the case of unorthodox domains like the vacuum vessels of the most important experiments in the magnetically confined fusion community today: ITER (See [69,102,68,98,4,47]) and the W7-X (See [26,109,88,110,8,67,112] ) since they are found in their corresponding VMEC-solution files. Finding the values at the nodes however, requires some sort of interpolation technique.…”
Section: Data Visualizationmentioning
confidence: 99%
See 1 more Smart Citation
“…In this investigation we try to quantify the related properties of a penetrant dye used during the assembly of the advanced stellarator Wendelstein 7-X [1]. The possible blocking of leaks by the PT medium was not investigated, because at the W7-X all PT tested vacuum boundary welds are leak tested before the PT application.…”
Section: Introductionmentioning
confidence: 99%
“…The first three modules of the magnet system (out of 5) have been successfully completed within schedule and are already installed in the torus hall [2,3].…”
Section: Introductionmentioning
confidence: 99%